CASES

Shopping Iguatemi - Porto Alegre

GIS Substation and Transmission Line Project

Gas Insulated Substation (GIS) of 15/18.75 MVA - 69kV/13.8KV GE Grid and 2.1km transmission line


Customer's Motivation:

  • Enable the Shopping's expansion;
  • Reduce operational costs;
  • Improve the reability of power supply.

Shopping Recife

Substation + Emergency Energy Generation Project

Gas Insulated Substation (GIS) of 10/12.5 MVA - 69kV/13.8KV Alstom, ATP and WEG and 1.0km transmission line + 1MW diesel power generator for back-up

Customer's Motivation:

  • Enable the Shopping's expansion;
  • Reduce operational costs;
  • Improve the reability of power supply;
  • Back-up power for emergencies.

Super Shopping Osasco

LED Lighting Retrofit

Shopping Indoor Lighting LED System

1.213 replaced points 

Customer's Motivation:

  • Cost Reduction;
  • Improve lighting quality;
  • Standarlization of the lighting solution.

Shopping Recife

LED Lighting Retrofit

Shopping Indoor and outdoor Lighting LED System

15.258 replaced points

Customer's Motivation:

  • Cost Reduction;
  • Improve lighting quality;
  • Standarlization of the lighting solution.